TORC is a Deployable (“in a Box”) AI Processing Developer of Distributed Energy/Off-Grid Clean On-Demand Power Generation & Storage Systems On-Site of AI Consumption
TORC is NOT another Battery Company, batteries are NOT Storage.We are a Zero Emission Power Generator from Waste Heat and a Firmer of Solar, to Discharge over Long Duration (Multi Day) On Demand Clean PowerJust as TORC provides Unique / Exclusive Modular Clean Power Generation Sets/Boxes, TORC via Major US OEMs of NIVIDIA GPUs, provides On-Site Deployable matching (in MW Power Capacity Need) Containerised AI “Factories” (Intense Compute Computers), “in a Box”(or Rack)TORC is the only Solution we know of in Australian that can Remove the AI Energy Grid Bottleneck (44GW AI Australian NEM Applications) with proven “Off-the Shelf Ready” Deployable Clean Power Generators and similarly Deployable AI “Factories” (Intense Compute) “in a Box” for an On-Demand On-Site Clean Energy SolutionALL IS “FACTORY BUILT” FOR MASSIVE AUTO SECTOR MASS PRODUCTION RAPID DEPLOYMENT & SCALE-UP
Clean Power Generation and AI Processing / Compute, deployed together On Site in Modular Containerised “Skid Mounted” Units “In a Box” for rapid “Pop Up” Deployment.
TORC Clean Energy is developing a portfolio of deployable energy systems that pair off-grid, behind-the-meter / on-site clean power generation with modular AI processing facilities.
Our model places power generation beside AI compute: electricity is used on site to run containerised AI factories that produce high-value compute services, Digital Output/AI Tokens.AI is now accepted as the largest Processed Energy Commodity the World has ever seen (85% of AI OPEX is Energy) and provides Energy producers with the most fantastically lucrative Downstream Income they have ever experienced = with Gas Spark Spread $350/GJ opposed to $15/GJ for LNG and Electricity Spark Spread $2000/MWh opposed to $80/MWh for Aluminium or $250/MWh for high earning Peaker Plant.TORC can create a “pop-up” processing facility that can be deployed wherever suitable power resources and operating sites are available. For example, a Dairy Factory or Ore Processing Operation in Tasmania scaling down its core operations Grid Draw could re-allocate its Grid Off-Take Contract Draw Entitlement to a TORC AI Factory Box deployed on site for additional [lucrative] income stream (100kW AI Capacity = $2.0 Million pa in EBITDA). Fully “Factory Built” Units Allows massive Auto Sector Scale Ramp Up. Cheaper and Faster than “Mega Grid AI Factories”.
In fact, we believe, the future for AI Processing is not On-Grid Mega Factories but Off-Grid Distributed Energy FACTORY BUILT Modular Processing Units rolling out over 1000 units of CleanGen and AI Boxes manufactured per day (subject to GPU availability) or >1GW of Capacity per day, capable of deployed coupling to Mega GW Scale in same way only one Container ship carries up to 10,000 Containers.PowerGen/AI Processing Unit Capacity start at 250kW and move up in 1MW and 10MW Block Units (all within 40ft Containers). Meaning for a “Mega Scale” Capacity Need, on only a small footprint and a couple of dozen boxes, the Need can be Filled. TORC integrates ready-to-deploy, containerised clean-generation systems sourced on “to Site/Turn-Key” basis from specialist international A Rated (for Turn-Key performance risk) OEMs in Partnership with TORC (with near Duopoly Market Share of their technology) and “skid-mounted” containerised AI factories also delivered on a to Site/Turn-Key Basis. TORC in is discussions with a major Investment Grade (for Turn-Key Performance Risk) Global AI technology Group/ OEM to TORC’s turnkey Technology Partner.
TORC Clean Long Duration Power Storage Firming Technology is Australian Government Agency ARENA Reviewed and Grant Approved
AND with TORC Storage, to 100% Clean & Sustainable by Firming cheap solar for the On-Demand Power needs of AI Processing.
TORC’s Unique Affordable Deployable Long Duration Clean Energy Storage System will allow full Transition to a Zero Emission Sustainable Off-Grid Distributed Energy Power Hub for AI Processing
As the Field Life runs, TORC will use its Firming (Multi Day Discharge) Storage System to move the Field to at least 80% Clean Energy Mix with On Site Solar Farms or Cheap Blocked Grid PV charging GWhs of Thermal TORC Storage in its Unique Latent Heat PCM Medium for Discharge on Need through TORC’s Zero Emission Turbine Generators
The TORC Transition Story
Via ready now TORC Clean Gensets and AI Processing “in a Box” TORC is the only Solution we know of on available technology (show us another) to be able to take AI off the Grid where it does not belong. AI does not belong on the Australian Grid because Australia has largely shut/is shutting down On-Demand Generation Capacity for C&I "Hard to Abate application, as a core blank to its Net Zero ambitions. The Grid certainly does not have the Capacity for the 44GW of NEM AI Applications. With what is left, is largely Coal Fired On-Demand Power.Therefore a sensible TRANSITION PATHWAY is to Off-Grid Gas Generators that are 50% less CO2 Emissions than Coal (with Methane a very short dispersal rate,) into authentic and creditable ”Hybrids” with an up to 50% Clean Energy Mix via our Waste to Energy ReGen Systems. Our Systems also obviously offer significantly extended Field Life and more robust Field Economics. Presently, "Hybrid" status is claimed with Solar on only an honest 15% Clean Mix… 75% fossil emission mix is not “Hybrid”. 
